Labs Sessions - Q2 2012

From Green Garage Detroit
Jump to: navigation, search

Home of the MADD Scientists - "Making A Difference Daily"....we hope!!!

return to Sustainability Labs
go to Labs Sessions - Q4 2011
go to Labs Sessions - Q1 2012
go to Labs Sessions - Q3 2012


Performing scientific study to support sustainable stewardship of our Community and Earth. Seeking the truth of our actions and having fun doing it.

   GG Labs Sessions are held each Friday after the Community Lunch, 
   starting at 1:30 p.m. and ending around 3:30 p.m., depending on the day's agenda.
   All are welcome to join in!
Altherma Heat Pump.JPG

Labs Sessions - 2nd Quarter 2012


Labs Session - Apr 6, 2012

  • Labs Updates
  • Food for Thought
  • Session Work
    • Shoulder Season What Ifs
    • Cooling Season What Ifs
  • Hands-On Activity
    • Short-Term Systems Experiments
      • Radiant floor loop temp sensors vs. Uponor gauges - Loops delta T
      • Radiant floor gpms vs. available pump gpms - Elevated HWS to primary to accommodate
      • P-3 on high speed; V-6 limit when tank temp low on cooler days - fighting each other
      • Altherma locked out with Solar Panel Schedule - currently no way to heat loop unless solar enabled - tanks and Altherma interlocked by schedule
  • Next Steps
    • Labs Session 4/13/2012 at 1:30 p.m.

Labs Session - Apr 13, 2012

  • Labs Updates
    • Commissioning Progress
      • Review cooling sequence of operation from Expert/Cochrane
      • Proposed revisions to system
    • Labs Experiments
      • Shoulder season/cooling season
      • Natural ventilation guidelines
  • Food for Thought
  • Session Work
    • Cooling system what ifs
  • Hands-On Activity
    • Review rainwater collection system
  • Next Steps
    • Labs Session 4/20/2012 at 1:30 p.m.

Labs Session - Apr 20, 2012

  • Labs Updates
    • Commissioning Progress
      • Final List of Revisions for Expert/Cochrane
    • Labs Experiments
      • Shoulder season drifting observations
      • Cooling & Dehumidification testing
      • Rubber Ducky Derby 2012
  • Food for Thought
  • Next Steps
    • Labs Session 4/27/2012 at 1:30 p.m.

Labs Session - Apr 27, 2012

  • Labs Updates
    • Commissioning Progress
      • Natural ventilation guidelines
    • Labs Experiments
      • Shoulder season observations
      • Rubber Ducky Derby 2012
  • Food for Thought
  • Hands-On Activity
    • Cooling & Dehumidification testing prep
  • Next Steps
    • Labs Session 5/4/2012 at 1:30 p.m.

Labs Session - May 4, 2012

  • Labs Updates
    • Commissioning Progress
      • Natural Ventilation parameters
      • Air filter gauge recommendation
    • Labs Experiments
  • Food for Thought
  • Session Work
    • Rainwater Collection on Roof - filtration & cleaning
  • Hands-On Activity
    • Rubber Ducky Derby prep
  • Next Steps
    • Labs Session 5/11/2012 at 1:30 p.m.

Labs Session - May 11, 2012

  • Food for Thought
  • Hands-On Activity
    • TBD
  • Next Steps
    • Labs Session 5/18/2012 at 1:30 p.m.

Labs Session - May 18, 2012

  • Labs Updates
    • Commissioning Progress
    • Labs Experiments
      • Cooling & Dehumidification
        • Solar Panel Night Cooling observations & trends
        • Plan for trickle loop cooling observations & trends
        • The Besemer Wall M&V
  • Food for Thought
  • Hands-On Activity
    • Field trip to admire Motor City Brewing Works new bottling line
  • Next Steps
    • Labs Session 5/25/2012 at 1:30 p.m.

Labs Session - May 25, 2012

  • Labs Updates
    • Kirsten on vaca
    • Commissioning Progress
    • Labs Experiments
      • Rubber Ducky Derby Rules Review
      • Cooling & Dehumidification
        • Duct mounted coil M&V
        • Altherma cooling mode M&V
        • The Besemer Wall M&V
        • Solar Panel Night Cooling observations & trends
        • Plan for trickle loop cooling observations & trends
      • Rainwater Usage Experiment Design
        • Measurement of in-ground tank volume/dipstick calibration
  • Food for Thought
  • Hands-On Activity
    • Cooling and Dehumidification Testing of ERU
  • Next Steps
    • Labs Session 6/1/2012 at 1:30 p.m.

Labs Session - Jun 1, 2012

  • Labs Updates
  • Food for Thought
  • Hands-On Activity
    • Verified electric meter current connections
  • Next Steps
    • Labs Session 6/8/2012 at 1:30 p.m.

Labs Session - Jun 8, 2012

  • Food for Thought
  • Session Work
    • The Besemer Wall M&V plan
    • Plan for trickle loop cooling observations & trends
  • Hands-On Activity
    • Cooling & Dehumidification Testing
      • Measure cooling coil T/RH in and out, duct airflow
      • Measure mixing air T/RH before and after, total airflow
      • Record Altherma readings for chilled water produced, water flow through coil
    • Verify building pressure - Historic, Annex at low speed and high speed
  • Next Steps
    • Labs Session 6/15/2012 at 1:30 p.m.

Labs Session - Jun 15, 2012

  • Labs Updates
    • Commissioning Progress
      • Updates to cooling controls - Expert/Cochrane
      • Training on trend logging using DDC
    • Labs Experiments
  • Food for Thought
  • Session Work
    • Options for correcting/improving building air pressurization
  • Next Steps
    • Labs Session 6/22/2012 at 1:30 p.m.

Labs Session - Jun 22, 2012

  • Labs Updates
    • Commissioning Progress
      • Air Filter Gauges with OCD
      • Updates to cooling controls - Expert/Cochrane
        • Controls updated June 21st
        • June 22nd test of Cooling of Zone 1
        • Floor Temperature at onset: 77.1F
          • Zone Cooling Loop Setpoint set to 65 degrees F
          • Zone Cooling Loop set to 60 degrees to speed up cooling process
            • Water into zone 1 floor loop reached 62.3 degrees F
            • V6 Cmd modulation
            • 76.2F Floor temperature
          • Conclusion - Faster cooling with running air through dehumidificator coil than running through floor.
        • Conversation with Chad about high humidity in his workshop
          • Sensor 2 moved to workshop to monitor humidity: 3:00pm temp = 73.9F (main building = 76.2F - 77F), humidity = 68.6% (Main building = 55.6% - 56.5%)
          • Impact issues:
            • Poor air circulation: need to increase air movement - supply air to be ducted to Chad's area. Return air ductwork location subject to further discussion.
            • Moisture entering through cement block walls and cement floor: - would require a moisture barrier.
    • Labs Experiments
  • Food for Thought
  • Session Work
    • Finalize plan for Measurement of in-ground tank volume/dipstick calibration


  • Next Steps
    • Labs Session 6/29/2012 at 1:30 p.m.

Labs Session - Jun 29, 2012

  • Labs Updates
    • Interim Chief Report
    • Commissioning Progress
    • Labs Experiments
      • GG Wiki Main Page simplification
      • Trickle loop experiment on hold during extreme heat
      • Rainwater Usage tracking in operation?
      • Kirsten's Waste Watch
        • Next audit? Friday, July 27, 2012
        • Trends & Goals / Policy communicated and easy to reference
      • The Earth Room Performance Insulated Septum Wall M&V (aka The Besemer Wall)
      • Phase 2 - Summer measurements on refrigerator electrical usage and performance
  • Food for Thought
  • Session Work
    • Annex Shop duct revision
  • Hands-On Activity
    • Hot weather refrigerator study
    • Measure and document existing airflows to remain

Resources

TO DO

  • Plan / Do / Check / Act / Repeat