Difference between revisions of "Structural"
From Green Garage Detroit
(→Additional Questions) |
|||
Line 59: | Line 59: | ||
* 7/31/09 | * 7/31/09 | ||
− | **Move water storage at 3 season room to wall surface not on wall | + | ** Move water storage at 3 season room to wall surface not on wall |
− | ** | + | ** Roof structure lvls and 2x8? |
Latest revision as of 13:38, 31 July 2009
Contents
Overall Responsibilities
- Seal Drawings:
- Details:
- Notes:
Included Drawings
- Drawing Pages / Details / Shop
- Roof
- Purlin / Truss / New Roof Connection
- Roof
Notes
Key Meetings
- Ike Shepard (07/06/09)
- Overall Prep Items
- Truss reinforcement drawings
- Ike's calcs...certification
- Addition drawings
- Structural Design Areas
- 1) New Historic Roof
- Prep Items
- ??
- Questions / Issues
- Roles and Responsibilities with Arch, Insulspan
- Bearing point on the purlins
- Josh needed the design loads (dead, live, wind, torque)
- Wind lift connections
- Exterior Wall / Roof Connection
- Prep Items
- 2) Roof Garden
- Prep Items
- Kevin's drawings and load calcs
- Questions / Issues
- Columns ...are they needed?
- Where to place the doorway through the truss
- Size and direction of supports
- Roof and skylight, with water storage over outside sitting area.
- Prep Items
- 3) Indoor / Outdoor Room
- Prep Items
- Kevin's drawings and load calcs
- Questions / Issues
- Columns ...are they needed?
- Where to place the doorway through the truss
- Size and direction of supports
- Roof and skylight, with water storage over outside sitting area.
- Prep Items
- 4) Solar Panels on Addition's Roof
- Prep Items
- Addition Drawings
- Solar Panel weights (2,000lbs, wind loads, locations)
- Location
- Questions / Issues
- Prep Items
- 1) New Historic Roof
- Cost Estimate
- Overall Prep Items
Additional Questions
- 7/31/09
- Move water storage at 3 season room to wall surface not on wall
- Roof structure lvls and 2x8?