Difference between revisions of "Labs Sessions - Q2 2013"

From Green Garage Detroit
Jump to: navigation, search
(Labs Session - Apr 5, 2013)
(Labs Session - Apr 12, 2013)
Line 93: Line 93:
  
 
* '''Session Work'''
 
* '''Session Work'''
** Review [[GGSL_Communication_Plan]] (GG Labs)
 
** Develop Master Plan for [[Labs As-Builts]] organization and final documentation
 
 
** RoofTop Farm Detroit Communication Plan Outline - Farm will work with USL to finalize
 
** RoofTop Farm Detroit Communication Plan Outline - Farm will work with USL to finalize
 
*** Blog - dedicated to Edible Flowers
 
*** Blog - dedicated to Edible Flowers
Line 101: Line 99:
 
*** RoofTop Tours - managed and intentional
 
*** RoofTop Tours - managed and intentional
 
*** Flickr for photos, U-Tube for videos
 
*** Flickr for photos, U-Tube for videos
 +
** Review [[GGSL_Communication_Plan]] (GG Labs)
 +
** Develop Master Plan for [[Labs As-Builts]]
 +
*** Organization and final documentation
 +
*** Categories of Body of Work
  
 
* '''Hands-On Activity'''
 
* '''Hands-On Activity'''

Revision as of 04:45, 13 April 2013

Home of the MADD Scientists - "Making A Difference Daily"....we hope!!!

return to Sustainability Labs
go to Labs Highlights
go to Labs Sessions - Q4 2011
go to Labs Sessions - Q1 2012
go to Labs Sessions - Q2 2012
go to Labs Sessions - Q3 2012
go to Labs Sessions - Q4 2012
go to Labs Sessions - Q1 2013


Geeks Rule

   GG Labs Sessions are held each Friday after the Community Lunch, 
   starting at 2:00 p.m. and ending around 3:30 p.m.
   All are welcome to join in!
Outdoor dining.jpg


Labs Sessions - 2nd Quarter 2013


MASTER LIST OF ON-GOING ACTIVITIES

  • Commissioning Items
    • BCS - Air Filter Gauges with OCD
    • BCS - Annex revised ductwork and airflow readings
    • BCS - Building pressurization by balance - summer/winter modes
    • BCS - Dickinson by Design Humidity Adventure - revise ventilation; monitor next summer
    • BCS - Training on trend logging using DDC
  • Labs Experiments
    • WATER - Rainwater Usage analysis at end of summer
    • WATER - Finalize plan for Measurement of in-ground tank volume/dipstick calibration
    • WASTE - Kirsten's Waste Watch
      • Trends & Goals / Policy communicated and easy to reference
    • BCS - The Earth Room Performance; optimize Earth Room exhaust fan
    • BCS - Cooling & Dehumidification M&V on coil
    • BCS - Trickle loop experiment on hold during extreme heat
    • ENERGY - Phase 2 - Summer measurements on refrigerator electrical usage and performance
    • Solar Oven - example

END OF LIST


Labs Session - Apr 5, 2013

  • Labs Updates
    • Flex Friday
    • Updated NV guidelines for spring 2013 (see Sep. 14, 2012 agenda)
      • Natural Ventilation Guidelines - NV Season - criteria for when to use NV guide
        • If the forecast high for the day is 70 deg F or greater and the current outside air temperature is 60 deg F or greater, then the NV Daily Worksheet should be used to determine if it is a NV day or not.
        • This is intended to prevent simultaneous heating and cooling (using the natural ventilation to cool the building down to or below our heating indoor set point).
      • sent guidelines to Tom
  • Food for Thought
  • Session Work
    • Labs Planning for 2nd quarter
      • 1. RoofTop Farm Detroit communication plan - next week
      • 2. Work on Labs As-Builts: organize list and complete
      • 3. Finish research on energy comparison parameters for Peggy's reporting
      • 4. Finish outstanding items on As-Builts list
      • 5. Annex humidity observations (June-ish)
        • Blog - Edible Flowers
        • Journal - written notebook upstairs to record day-to-day tasks & documented on the wiki
        • Social Media: software - Buffer linked to Facebook & Twitter
        • RoofTop Tours managed and intentional
          • building tour or rooftop tour
          • size (number of people)
          • design of tour
        • Flickr for photos, U-Tube for videos
    • Master Plan for Labs As-Builts
  • Hands-On Activity
    • Go Tigers!!
  • Next Steps
    • Energy Reporting Standard (index to use for comparison; possibly improve waste/water) - Reporting for Continuous Cx
    • Labs Session 4/12/2013 at 2:00 p.m.

Labs Session - Apr 12, 2013

  • Labs Updates
    • Labs Annual Dewpoint Experiment 3.0 - Thurs., May 23, 2013 (meet at GG 5:00 p.m.)
    • Geeks On Loan (K 5/10,5/24; H 4/26-5/10; L 5/3; T ?)
    • Earth Tubes as only means of ventilation air dehumidification - not recommended
    • Air Quality Egg
  • Food for Thought
  • Session Work
    • RoofTop Farm Detroit Communication Plan Outline - Farm will work with USL to finalize
      • Blog - dedicated to Edible Flowers
      • Journal - written notebook recording day-to-day tasks & documented electronically on the Wiki
      • Social Media - target once every 1-2 weeks
      • RoofTop Tours - managed and intentional
      • Flickr for photos, U-Tube for videos
    • Review GGSL_Communication_Plan (GG Labs)
    • Develop Master Plan for Labs As-Builts
      • Organization and final documentation
      • Categories of Body of Work
  • Hands-On Activity
    • Stay awake
  • Next Steps
    • Labs Session 4/19/2013 at 2:00 p.m.

Labs Session - Apr 19, 2013

  • Labs Updates
  • Food for Thought
  • Hands-On Activity
  • Next Steps
    • Labs Session 4/26/2013 at 2:00 p.m.

Labs Session - Apr 26, 2013

  • Labs Updates
  • Food for Thought
  • Session Work
  • Hands-On Activity
  • Next Steps
    • Labs Session x/x/2013 at 2:00 p.m.

Labs Session - x, 2013

  • Labs Updates
  • Food for Thought
  • Session Work
  • Hands-On Activity
  • Next Steps
    • Labs Session x/x/2013 at 2:00 p.m.

Labs Session - x, 2013

  • Labs Updates
  • Food for Thought
  • Session Work
  • Hands-On Activity
  • Next Steps
    • Labs Session x/x/2013 at 2:00 p.m.

Labs Session - x, 2013

  • Labs Updates
  • Food for Thought
  • Session Work
  • Hands-On Activity
  • Next Steps
    • Labs Session x/x/2013 at 2:00 p.m.

Labs Session - x, 2013

  • Labs Updates
  • Food for Thought
  • Session Work
  • Hands-On Activity
  • Next Steps
    • Labs Session x/x/2013 at 2:00 p.m.

Labs Session - x, 2013

  • Labs Updates
  • Food for Thought
  • Session Work
  • Hands-On Activity
  • Next Steps
    • Labs Session x/x/2013 at 2:00 p.m.

Labs Session - x, 2013

  • Labs Updates
  • Food for Thought
  • Session Work
  • Hands-On Activity
  • Next Steps
    • Labs Session x/x/2013 at 2:00 p.m.

Labs Session - x, 2013

  • Labs Updates
  • Food for Thought
  • Session Work
  • Hands-On Activity
  • Next Steps
    • Labs Session x/x/2013 at 2:00 p.m.

Labs Session - x, 2013

  • Labs Updates
  • Food for Thought
  • Session Work
  • Hands-On Activity
  • Next Steps
    • Labs Session x/x/2013 at 2:00 p.m.

Labs Session - x, 2013

  • Labs Updates
  • Food for Thought
  • Session Work
  • Hands-On Activity
  • Next Steps
    • Labs Session x/x/2013 at 2:00 p.m.

Labs Session - x, 2013

  • Labs Updates
  • Food for Thought
  • Session Work
  • Hands-On Activity
  • Next Steps
    • Labs Session x/x/2013 at 2:00 p.m.

Resources

TO DO

  • Plan / Do / Check / Act / Repeat