Difference between revisions of "Labs Sessions - Q1 2015"

From Green Garage Detroit
Jump to: navigation, search
(Labs Session - May 1, 2015)
(Labs Session - May 1, 2015)
Line 234: Line 234:
  
 
* '''Next Project and Beyond'''
 
* '''Next Project and Beyond'''
** Next Project
+
** Next Project - Coil Condensation
 
** Energy Monitoring
 
** Energy Monitoring
  

Revision as of 19:18, 1 May 2015

Home of the MADD Scientists - "Making A Difference Daily"....Time to Reinvent the Wheel!!

return to Sustainability Labs
go to Labs Highlights
go to Labs Sessions - Q1 2014
go to El Moore Near Zero Design

Geeks Rule

   GG Labs Sessions are held the first Friday of each month after the
   Community Lunch, starting at 1:30 p.m. and ending around 4:30 p.m.
   Everyone is invited to come hang out!!
GGLabsEnergyMap.jpg

Cave Day Items

  • Commissioning Items
    • BCS - Training on trend logging using DDC
    • ENERGY - Tracking energy produced vs. used; on-going Cx using DDC monitoring
  • Labs Experiments
    • WATER - Rainwater Usage analysis at end of summer
    • WATER - Finalize plan for Measurement of in-ground tank volume/dipstick calibration
    • WASTE - Kirsten's Waste Watch
      • Trends & Goals / Policy communicated and easy to reference
    • BCS - Cooling & Dehumidification M&V on coil
    • BCS - Trickle loop experiment
    • ENERGY - Phase 2 - Finish documentation on refrigerator electrical usage and performance
    • Solar Oven - example
  • CURRENT CAVE DAY FOCUS
    • For MAY 15 - The Earth Room Performance (efficiency) number crunching; is Earth Room bypass viable; optimize Earth Room exhaust fan
    • BCS - Annex revised ductwork and airflow readings
    • BCS - Building pressurization by balance - summer/winter modes

END OF LIST


Labs Sessions - 1st Quarter 2015


Labs Session - Jan 16, 2015

  • Happy New Year!!
  • LABS VisionQuest 2015
    • Roots
    • Future Growth
    • Meeting Frequency & Time
      • Labs Projects
        • First Friday of month from 1:30-4:30 p.m. (except July and September will be second Friday due to holidays)
        • Open to everyone
        • Generally intended to be a "hands on" science-related project that can be completed in approx. 3 hour span including brief analysis at end of activity to determine general results and decide if further analysis would be beneficial
      • Cave Day
        • Third Friday of month unless otherwise noted on Labs Calendar
        • Generally intended to be for deep analysis, extended calculations, or enhanced documentation of previous activities that are not well suited to group activity (busy work or catch-up activities)
  • What I Did On My Summer Vacation
  • Next Session and Beyond
    • Ideas - Date
    • Red Panda Heating

Labs Session - Feb 6, 2015

  • Labs Updates
    • Topic for March 6, 2015 Project - Earth Room wrap-up
    • Cave Day Plan (see above) - prep Earth Rm info for March 6 Project
    • Cool Stuff: Vampire Loads Study
    • Today's Project: Red Panda Space Temp Study
  • Prep - Overview
    • Heat Sources - Premise of Operation
    • Paths of Heat Transfer
    • Review trends from this week (space temp, water temp, etc.)
  • Hands-On
    • Annex space pressure differentials
    • Ventilation airflows
    • Floor heating profile
    • Temperature gradients in room
  • Brain Work
    • Review observations/results
  • Conclusions & Suggestions - See RED PANDA TEMPERATURE STUDY REPORT
    • Any additional research or calcs required?
      • None identified at this time
  • Next Project and Beyond
    • March 6 Project - Plan A, Earth Room

Labs Session - Mar 6, 2015

  • Labs Updates
    • 30 minutes with Tom Brennan - Red Panda Recap
    • Topic for April 3, 2015 Project
      • Plan the trash audit
      • Finish up Earth Room
    • Cave Day Plan (see above)
    • GG Ventilation System Observations
      • Scheduled for 8a-6p
      • Trend showing on about 3 hours later
      • Clock correct on Jace? On trend histories?
      • Sometimes only on for 1 hour at a time
      • Not reading CO2 when off; sometimes CO2 spiking after system turned off
      • No toilet exhaust when off
      • Some toilet room odors, stuffy nose, coughing noted at times
      • ERV wheel could freeze on super cold days, but designed to have wheel turned off during potential freezing (see design; 5 deg F??)
      • Ask Joe for update on current cold weather ventilation strategy (LLC emailed 3/24/15)
    • Today's Project: Altherma / Earth Room Performance
  • Prep - Overview
    • Goals of Project - see Earth Room Performance
    • Review previous work completed
    • Plan to finish
      • Review measurements and how to improve; get more close to snapshot of time
      • Relationship between heat transfer loops to get to mfg chart more accurately
      • Measure electrical with domestic water heater off
  • Hands-On
    • How to measure electrical component of Altherma - turn off water heater temporarily; no dishwasher on at that time
    • Field investigation - next time
      • Verify location/size of air bypass
      • Verify exhaust fan capacity compared to air bypass capabilities
  • Brain Work - After getting readings
    • Verify Altherma operation on mfg performance charts
    • Run simulation for annual operation of Altherma with and without bypass
    • Estimate energy savings
    • Estimate cost to install/control air bypass
    • Document findings / recommendation
  • Conclusions - Suggestions
    • Based on findings, determine if should continue to pursue
  • Next Project and Beyond
    • April 3 Project
    • Trash Audit in May - to be scheduled based on Kirsten's zoot soot
    • Energy Monitoring

Labs Sessions - 2nd Quarter 2015


Labs Session - April 10, 2015

  • Labs Updates
    • Friday Lunch Presentation on Red Panda work
      • Reviewed with Matt for format and content
      • Create PowerPoint to highlight main points and show images of results
    • Upcoming Projects
      • May 1, 2015 - Live Trash Audit
      • June 2015 - Dehumid Coil Condensation Investigation
    • GG Cold Weather Ventilation Policy - Particle Counter, CO2
    • Cave Day Plan (see above)
    • Today's Activity: Plan Trash Audit & Red Panda Presentation
  • Today's Project: Live Trash Audit Planning
    • Time: May 1 during lunch
    • Place: near doors to Annex
    • Protocol: open 1 bag on tarp, review compost, finish rest during Labs
    • Goals: see how we are doing; straighten out issues with compost
    • Kirsten's outfit is on track to be ready
    • Kirsten bring tarp(s), gloves, grabber tool
    • Laurie photographer
    • Helen record results and notations
    • Matt will make sure to hold trash from collection that Friday
    • Tom Brennan has microphone to broadcast audit; Matt will coordinate
  • Today's Project: Red Panda Presentation Planning
    • Into to systems, problem / solution / how its working / examples
  • Next Project and Beyond
    • May Project - Trash Audit
    • June Project - Coil Condensation Issue
    • Future - Trickle Loop, Energy Monitoring

Labs Session - May 1, 2015

  • Labs Updates
    • Topic for Next Month's Project - Coil Condensation Issue
    • Cave Day Plan (see above)
    • Today's Project: Live Trash Audit
  • Hands-On
    • Open first bag
    • Compost
    • Rest of trash
      • Bag 1 - 3.6 lbs - no notes
      • Bag 2 - 7.8 lbs - lots of paper could have been recycled
      • Bag 3 - 2.0 lbs - plastic grocery bags, lots of Starbucks cups
      • Bag 4 - 3.6 lbs - fridge clean out bag
      • Bag 5 - 5.8 lbs - more Starbucks, clean paper bags, plastic utensils should be left at carryout
      • Bag 6 - 1.6 lbs - more Starbucks, plastic flower bag
      • Bag 7 - 1.4 lbs - lots of plastic grocery bags, borderline Styrofoam
      • Misc boxes, brown packing paper could be recycled
      • Judgment call on rinsing out containers vs pitching, especially if oily
  • Brain Work
    • What are we doing well
      • Not many recycling mistakes
    • Where could we improve
      • Starbucks compostable cups, bring your own washable
      • Plastic grocery bags
      • Some paper, cardboard
  • Conclusions - Suggestions
    • Documentation
      • Blog with photos
    • How to communicate results
      • Matt send out to community
  • Next Project and Beyond
    • Next Project - Coil Condensation
    • Energy Monitoring

Labs Session - x x, 2015

  • Labs Updates
    • Topic for Next Month's Project
    • Cave Day Plan (see above)
    • Today's Project:
  • Prep - Overview
  • Hands-On
  • Brain Work
  • Conclusions - Suggestions
  • Next Project and Beyond
    • Next Project
    • Energy Monitoring

Resources

TO DO

  • Plan / Do / Check / Act / Repeat