   GG Labs Sessions are held the first Friday of each month after the
   Community Lunch, starting at 2:00 p.m. and ending around 4:00 p.m.
   All are welcome!!
GGLabsMascots.jpg

Labs Sessions - 1st Quarter 2017


Labs Session - Jan 6, 2017- PLANNING

  • Labs Updates
    • Catching Up
    • Today's Project: 2017 Labs Planning & GG Solar Thermal Mystery
  • 2017 LABS Topics
    • 1) Our report on the duct changes in the annex
      • GG IAQ Study 1.0
      • GG IAQ Study 2.0
      • LLC will consolidate sketch of elbow options with notes and send to Tom
      • Next month, try to get Jeff from Cappy to Labs to look at changes and finalize plan to improve airflow
    • 2) Solar PV panels on the annex at the GG this year
    • 3) Study of annex lights, T8 to LED, with DTE Maybe program for rebate
      • Nate will take lead and investigate source of lights and program requirements
      • Laurie has contacts that can help advise on lighting and DTE, if needed
      • Review prelim findings in Feb, if ready
    • 4) Weatherstripping for the El Moore Lodge windows - experiment with various methods this winter
      • Double hung with medium brush for weather stripping now
      • Too much brush type makes windows hard to operate
      • Brush with plastic fin in middle may provide better seal
      • Plan to test a few windows/methods and apply to worst case; decide when see how pilot testing pans out
    • 5) Blower door test on El Moore Gardens building
      • Coordinate with Joe for when building is ready for blower door
      • Labs will help organize and perform test and then document results with any recommendations
  • GG Solar Thermal
    • Solar thermal not heating up
    • Reviewed trends and found no heating since around 12/18/16
    • No real evidence of leak on roof, but found small storage tank 75% empty
    • Joe turned solar thermal pump off at switch and refilled tank; will look for leak
  • Who's Next
    • Cave Day - off site this month
    • Next Month - Duct Enhancement, Annex LED Lighting update

Labs Session - Feb 3, 2017

  • Labs Updates
    • Catching Up
    • Today's Project(s):
      • Duct Enhancement
      • Ventilation Final Report
  • Who's Next
    • Cave Day - El Moore Preventative Maintenance Plan
    • Next Month - Duct Enhancement w/ Cappy

Labs Session - Mar 3, 2017

  • Labs Updates
    • Catching Up
      • Florida Dewpoint Experiment FYI - 3/23/17 - 4/4/17
    • Today's Projects:
      • Duct Enhancement w/ Cappy - postponed
      • Prep for Other Potential Projects
  • Prep - Overview
    • GG Upgrades
      • Phase 1 - Supply Duct Enhancement - Cappy
      • Phase 2 - Labs Rebalancing w/ Joey G & Noise Analysis of Fan Speeds
      • Phase 3 - Remaining Balance Issues - ERV Fan Speeds, if needed
      • Phase 4 - DDC upgrades - make tank emergency and normal Altherma direct to floor heating with software button override on controls page as well as hard-wired switch
    • El Moore Lodge window weather-stripping experiment - working on over the next year
    • El Moore Gardens building blower door test - not sealed up yet
    • Annex Lighting Upgrade
      • Inventory
      • DTE Maybe program requirements & incentives
  • Who's Next
    • Cave Day - add last year to as-built index, button ups
    • Next Month

Labs Session - Apr 7, 2017

  • Labs Updates
    • Catching Up
      • Summer Schedule
      • Duct Enhancement w/ Cappy - completed; ready for phase 2
      • El Moore Greens Progress - blower door test status? - not yet
      • Phase 2 TAB - check w/ Joey G to start 5/5/2017 - get lamp shade for reading airflow
    • Today's Projects:
  • GG PV System Verification
    • Review new PV system design & specs - original GG PV System Design
    • ENPHASE Monitoring
    • Verification plan
      • Put data logger on PV produced vs feed to building to compare amps used
  • Annex LED Lighting
    • Update from Nate (phone conversation)
    • Bulbs or Fixtures?
      • Flexibility, quality, dimmable-ness, energy usage the same
      • Depends on budget
    • Buy from DTE certified supplier or through contractor?
      • Light bulbs through supplier
      • Need certified electrician to tie in ballast
    • Cautions - cheap bulbs flicker; get good quality
    • DTE Maybe Program
      • Contractor fills out application
      • Some aren't familiar, so check out ahead of time
      • Recommend typing up scope of work to send to contractor
    • Occupancy sensors / Dimmable / Photos & Requirements - will send to LLC?
  • Conclusions - Suggestions
    • GG PV System Verification
    • Annex LED Lighting
  • Who's Next
    • Cave Day
      • DTE Maybe program specifics
      • Plan for Phase 2 TAB on 5/5/17
      • Reserve time with Joey G
    • Next Month
      • Phase 2 Labs Air Balancing (max. 3 months to complete)
      • Check for additional duct fitting improvement

Labs Session - May 5, 2017

  • Labs Updates
    • Catching Up
    • Today's Project: START - Phase 2 - GG Ventilation Air TAB (Test & Balance)
  • Prep - Overview
    • June - Benchmark Current + New Totals
    • July - Inlets + Outlets
    • August - Final Airflows & Issues + Documentation
  • Hands-On
    • Benchmark Ventilation - Measure and record current operations in main modes of operation
    • Set new total airflow at ERV high speed
      • Booster fan off
      • Booster fan low speed
      • Booster fan high speed
      • System static pressure profile (Check pressure drop across supply fittings being considered for improvement)
    • Set new total airflow at ERV low speed
      • Booster fan off
      • Booster fan low speed
      • Booster fan high speed
    • Check new total airflow at ERV off
      • Booster fan low speed
      • Booster fan high speed
  • Brain Work
    • Determined all fan speed modes needed for benchmarking current airflows in all modes.
    • See Labs notebook.
  • Conclusions - Suggestions
    • Need to make sure Jace-Niagara upgrades successfully implemented to proceed in June.
    • Benchmark readings also provides opportunity to verify modes still operating properly after upgrade project.
  • Who's Next
    • Cave Day - summarize modes to be checked; prep for measurements in June.
    • Next Month - Benchmark Current + New Totals

Labs Session - June 2, 2017

  • Labs Updates
    • Catching Up
    • Today's Project: CONTD. - Phase 2 - GG Ventilation Air TAB (Test & Balance)
  • Prep - Overview
    • June - Benchmark Current + New Totals
    • July - Inlets + Outlets
    • August - Final Airflows & Issues + Documentation
  • Hands-On
    • Measured ERV SF, ERV EF, Booster Fan on low speed
    • Measured ERV SF, ERV EF, Booster Fan on high speed
  • Brain Work
    • Missing the new modes of operation - should check new plus make sure old modes still correct
    • ERV EF on high appears to be low
    • Booster fan on low appears to be low, but did not check high speed branch to make sure damper closed CHECK
    • Booster fan on high appears to be a little high, but should be okay
    • Booster fan high speed point does not appear to be registering when fan goes to high speed CHECK
  • Conclusions - Suggestions
    • Continued during CAVE DAY - take additional fan readings; adjust fan speeds if Joe available and readings confirm need to adjust
    • Airflow Measuring
  • Who's Next
    • Cave Day - Continue fan readings and setup adjustments
    • Next Month - Rebalance Inlets & Outlets

Labs Session - July 7, 2017

  • Labs Updates
    • Catching Up
    • Today's Project: CONTD. - Phase 2 - GG Ventilation Air TAB (Test & Balance)
  • Prep - Overview
    • June - Benchmark Current + New Totals
    • July - Inlets + Outlets
      • Reset Booster Fan low speed
      • Reset ERV EF low speed total
      • Rebalance exhaust branch on low speed
      • Check supply airflow to Annex at each register
    • August - Final Airflows & Issues + Documentation
  • Hands-On
    • Double check booster fan total w/ BF & ERV on low speed (first time BF extremely low??)
      • Make sure ERV / BF both on low speed (Mode 4,5,6)
      • Measure BF outlet total (Main Supply)
      • Check D4 closed and supplemental branch is zero
      • Reset BF low speed setting, if needed to get 765 CFM
      • Record results
    • Reset ERV low speed airflow
      • Make sure ERV / BF both on low speed (Mode 4,5,6)
      • Set ERV EF speed so total is 545 CFM by manual speed controller
      • Measure resulting ERV SF total and record; verify approx. 545 CFM
      • Record results - indicate if EF / SF fans speed okay w/ linked speed control
    • Rebalance exhaust branch
      • Set large conf room to 100 CFM (110 CFM max.)
      • Verify noise level acceptable at higher flow
      • Check rest of branch to design airflows on exhaust
      • Adjust individual inlets to get design airflows
      • Adjust ERV EF speed as needed to achieve design airflows
      • Record results
    • Check ERV high speed airflows
      • Set system so ERV on high speed and BF on low speed (Mode 1 - Occ / CO2 / no Dehumid)
      • Measure ERV SF & EF total airflows; verify approx. 765 CFM each
      • Measure exh inlets (spot check first & last min.); verify within design
      • Adjust D5 full open setting if needed to restore critical branch exh
      • Record results
  • Brain Work
    • Review results
    • Plan for Cave Day
    • Plan for August Labs
  • Conclusions - Suggestions
    • Need to read airflows when building unoccupied to get stable values and relative to each other; very inconsistent
    • Need airflow hood for larger round diffusers approx. 7"-8" could make 8x8 and taper to 6" round
    • Annex other than Unisex read in ductwork
  • Who's Next
    • Cave Day
      • Finish up rebalance
      • Outline process for Re-Cx controls system
    • Next Month

Labs Session - x x, 2017

  • Labs Updates
    • Catching Up
    • Today's Project:
  • Prep - Overview
  • Hands-On
  • Brain Work
  • Conclusions - Suggestions
  • Who's Next
    • Cave Day
    • Next Month

Cave Day Items

  • Commissioning Items
    • ENERGY - Tracking energy produced vs. used
    • ON-GOING Cx - using DDC for monitoring & persistence
  • Labs Experiments
    • WASTE - Kirsten's Waste Watch
    • BCS - Cooling & Dehumidification M&V on coil
    • BCS - Trickle loop experiment
    • ENERGY - Phase 2 - Finish documentation on refrigerator electrical usage and performance
    • [1] Solar Oven - example
  • CURRENT CAVE DAY FOCUS
    • Holdovers from 2015
      • Trickle Loop Experiment
      • Earth Room Performance (efficiency) number crunching; is Earth Room bypass viable; optimize Earth Room exhaust fan
    • BCS - Annex revised ductwork and airflow readings
    • BCS - Building pressurization by balance - summer/winter modes

END OF LIST


Resources

To Do

  • Plan / Do / Check / Act / Repeat
  • 2017 LABS Topics
    • 1) Our report on the duct changes in the annex (he has someone to do the work). Is there any chance the final touches on the rest of the report can be completed?
    • 2) Solar panels on the annex at the GG this year.
    • 3) Study of annex lights. T8 to LED
    • 4) Weatherstripping for the El Moore Lodge windows - experiment with various methods this winter.
    • 5) Blower door test on El Moore Gardens building