Difference between revisions of "Labs As-Builts by Category"
From Green Garage Detroit
(→Labs As-Builts By Category) |
|||
(9 intermediate revisions by 3 users not shown) | |||
Line 2: | Line 2: | ||
go to [[Labs As-Builts]]</small> | go to [[Labs As-Builts]]</small> | ||
− | |||
− | + | ===Labs As-Builts By Category (9/2011 through 4/2013)=== | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | ===Labs As-Builts By Category=== | + | |
====Experiments==== | ====Experiments==== | ||
− | * | + | * Altherma Low Flow Troubleshooting - 1/13/2012 |
− | + | * Flow in the Tank Bypass - 2/3/2012 | |
+ | * Heat exchanger performance with extra flow - 2/17/2012 | ||
+ | * Radiant primary loop 3-way valve limited - 2/17/2012 | ||
+ | * Short Term Experiments w/Radiant floor gpm, P-3 high speed vs V-6 limited?? - 4/6/2012 | ||
+ | * The Besemer Wall M&V & Earth Room Performance - 5/18/2012, 6/15/2012 | ||
+ | * Altherma Direct To Floor - 9/28/12, 1/25/13 | ||
====Measurement & Verification (M&V)==== | ====Measurement & Verification (M&V)==== | ||
− | * | + | * Blower Door Test - 9/23/2011 - 10/14/2011 |
+ | * Solar Thermal Performance - 9/30/2011, 3/16/2012 (data) | ||
+ | * Trash Tracking - 10/7/2011 | ||
+ | * Trash Audit - 11/18/2011 | ||
+ | * Refrigerator Energy Study - 12/2/2011, 7/27/12 | ||
+ | ** Blog report on tumblr | ||
+ | * Earth Room Fan Optimization - 1/27/2012 | ||
+ | * new solutions group temperature gradient study - 2/3/2012 | ||
+ | ** Radiant floor temp vs. water temp vs. space air temp | ||
+ | * M&V of domestic water heater & Annex heater electrical energy usage - 3/9/2012 | ||
+ | * Cooling & Dehumidification Testing - 4/27/2012, 5/25/2012 (agenda info & link), 6/8/2012 | ||
+ | * Building Air Pressurization - 6/15/2012 | ||
+ | * Building Comfort Performance for Heat Wave - 7/13/12 | ||
+ | * Earth Room Performance - 7/27/12, 9/14/12 data | ||
+ | * Solar Thermal Panel Performance - 10/19/12 (info), 10/26/12, 12/21/12, 1/4/13 (radiation map) | ||
+ | * Calibration of Sensors - 11/9/12 | ||
+ | * Heating/Cooling Costs for First Year - 11/9/12 | ||
+ | * Reading Meters - 2/15/13 | ||
+ | * Measurement Pages - 2/22/13 | ||
+ | * Compost Measurements - 3/1/13, (do again in summer) | ||
====Research==== | ====Research==== | ||
− | * | + | * Wireless Thermostat Study - 11/11/2011 - 11/18/2011 |
+ | ** Calibration of new sensors - 1/27/2012 | ||
+ | * Plug Load Study - 12/9/2011 | ||
+ | * Solar Thermal Panel Freeze Incident - 1/6/2012 | ||
+ | * CO2 Levels During Events - 1/13/2012, 3/9/2012 (GG conf rm window policy developed) | ||
+ | * Worm-A-Palooza - 2/3/2012 - 3/2/2012 | ||
+ | * Rainwater Usage Experiment - 4/20/2012 (unfinished), 5/4/2012 (cleaning & filtration) | ||
+ | * Solar Panel Night Cooling Observations - 5/18/2012 | ||
+ | * Trickle Loop Non-Experiment - 5/18/2012 (decided not to use; document in as-builts) | ||
+ | * Tax Credit - 8/2/12 | ||
+ | * BioBag Research - 9/28/12, 10/5/12 (on-going) | ||
+ | * Rooftop Farm Prep - 10/5/12, 12/7/12 | ||
+ | * Water Bill Spike - 12/21/12 (happened in October, reviewed in December) | ||
+ | * Solar Panel Freeze 2.0 - 1/4/13 | ||
+ | * Energy Reporting for Commercial Bldgs - 1/18/13 | ||
+ | * Trend Logging - 2/1/13, 2/8/13 (results link) | ||
====Continuous Improvement==== | ====Continuous Improvement==== | ||
− | * | + | * Air Balancing Ventilation System - 10/14/2011 |
+ | * Building Systems Commissioning the Natural Way - 10/28/2011 | ||
+ | * Cooling Season & Shoulder Season What-Ifs - 4/6/2012, 6/22/2012 (clg controls updates) | ||
+ | * Natural Ventilation Guidelines - 4/13/2012, 5/11/2012 (documentation), 7/13/12, 9/8/12 | ||
+ | * Air Filter Gauge - 5/11/2012 | ||
+ | * Wood Shop High Humidity - 6/22/2012, 6/29/12 (link to info), 10/12/12 (Annex space conditions) | ||
+ | * Annex Duct Revisions & Rebalance - 7/13/12 | ||
+ | * Heating Season Prep - 9/21/12 - Step by step info on what we intended to check REVISIT | ||
+ | ** Performed radiant floor part | ||
+ | ** Earth room part left to do | ||
+ | ** Annex proposed improvements - 9/21/12, 10/5/12, 11/9/12 (conditions), 12/7/12 (on-going) | ||
+ | |||
+ | ====Misc==== | ||
+ | * Util-A-Tour - 11/11/2011 | ||
+ | * Master List of On-Going Activities started 3rd Quarter 2012 | ||
+ | * Solar Btu Meter - 3/22/13 | ||
---- | ---- |
Latest revision as of 16:34, 2 May 2015
go to Labs Sessions - Q2 2013
go to Labs As-Builts
Contents
Labs As-Builts By Category (9/2011 through 4/2013)
Experiments
- Altherma Low Flow Troubleshooting - 1/13/2012
- Flow in the Tank Bypass - 2/3/2012
- Heat exchanger performance with extra flow - 2/17/2012
- Radiant primary loop 3-way valve limited - 2/17/2012
- Short Term Experiments w/Radiant floor gpm, P-3 high speed vs V-6 limited?? - 4/6/2012
- The Besemer Wall M&V & Earth Room Performance - 5/18/2012, 6/15/2012
- Altherma Direct To Floor - 9/28/12, 1/25/13
Measurement & Verification (M&V)
- Blower Door Test - 9/23/2011 - 10/14/2011
- Solar Thermal Performance - 9/30/2011, 3/16/2012 (data)
- Trash Tracking - 10/7/2011
- Trash Audit - 11/18/2011
- Refrigerator Energy Study - 12/2/2011, 7/27/12
- Blog report on tumblr
- Earth Room Fan Optimization - 1/27/2012
- new solutions group temperature gradient study - 2/3/2012
- Radiant floor temp vs. water temp vs. space air temp
- M&V of domestic water heater & Annex heater electrical energy usage - 3/9/2012
- Cooling & Dehumidification Testing - 4/27/2012, 5/25/2012 (agenda info & link), 6/8/2012
- Building Air Pressurization - 6/15/2012
- Building Comfort Performance for Heat Wave - 7/13/12
- Earth Room Performance - 7/27/12, 9/14/12 data
- Solar Thermal Panel Performance - 10/19/12 (info), 10/26/12, 12/21/12, 1/4/13 (radiation map)
- Calibration of Sensors - 11/9/12
- Heating/Cooling Costs for First Year - 11/9/12
- Reading Meters - 2/15/13
- Measurement Pages - 2/22/13
- Compost Measurements - 3/1/13, (do again in summer)
Research
- Wireless Thermostat Study - 11/11/2011 - 11/18/2011
- Calibration of new sensors - 1/27/2012
- Plug Load Study - 12/9/2011
- Solar Thermal Panel Freeze Incident - 1/6/2012
- CO2 Levels During Events - 1/13/2012, 3/9/2012 (GG conf rm window policy developed)
- Worm-A-Palooza - 2/3/2012 - 3/2/2012
- Rainwater Usage Experiment - 4/20/2012 (unfinished), 5/4/2012 (cleaning & filtration)
- Solar Panel Night Cooling Observations - 5/18/2012
- Trickle Loop Non-Experiment - 5/18/2012 (decided not to use; document in as-builts)
- Tax Credit - 8/2/12
- BioBag Research - 9/28/12, 10/5/12 (on-going)
- Rooftop Farm Prep - 10/5/12, 12/7/12
- Water Bill Spike - 12/21/12 (happened in October, reviewed in December)
- Solar Panel Freeze 2.0 - 1/4/13
- Energy Reporting for Commercial Bldgs - 1/18/13
- Trend Logging - 2/1/13, 2/8/13 (results link)
Continuous Improvement
- Air Balancing Ventilation System - 10/14/2011
- Building Systems Commissioning the Natural Way - 10/28/2011
- Cooling Season & Shoulder Season What-Ifs - 4/6/2012, 6/22/2012 (clg controls updates)
- Natural Ventilation Guidelines - 4/13/2012, 5/11/2012 (documentation), 7/13/12, 9/8/12
- Air Filter Gauge - 5/11/2012
- Wood Shop High Humidity - 6/22/2012, 6/29/12 (link to info), 10/12/12 (Annex space conditions)
- Annex Duct Revisions & Rebalance - 7/13/12
- Heating Season Prep - 9/21/12 - Step by step info on what we intended to check REVISIT
- Performed radiant floor part
- Earth room part left to do
- Annex proposed improvements - 9/21/12, 10/5/12, 11/9/12 (conditions), 12/7/12 (on-going)
Misc
- Util-A-Tour - 11/11/2011
- Master List of On-Going Activities started 3rd Quarter 2012
- Solar Btu Meter - 3/22/13