HVAC 2.0 To Do List

From Green Garage Detroit
Revision as of 12:39, 2 February 2011 by Tom Brennan (Talk | contribs) (Dave Ladwig)

Jump to: navigation, search

To Do's

Tom Brennan

  • Obtain spec for the drainback system (02/01)
  • Select weather station and email to Dave for review (02/01)
  • Schedule meeting for the ventilation controls (02/01)
    • Obtain current status of controls on ERU from Dan B. (02/01)
    • email link of As-Built to Dave
  • Update sequence of operations (02/01)

Rob Kelly

  • Size valves and email to group (02/01)
  • Schedule P&F to inspect tanks (02/01)
  • Design and estimate solar panel to trickle loop connection (02/01)
  • Schedule kickoff meeting (02/01)
  • Schedule Jeff introduction visit (02/01)
  • Provide final agreement to Green Garage (02/01)

Dave Ladwig

  • Complete estimate for the controls of the hydronic system (02/01)
  • Review the weather station selection for connectivity requirements (02/01)

Joe Gallagher

  • Develop shared schedule with Expert Mechanical (02/01)

Closed To-Do's



Meetings

Feb 1

  • Attendees: Rob, Dave, Tom, Joe and Tom
  • Agenda
    • Tanks
    • Schedule
    • Sign Agreements
    • Setup Kick-off meeting
    • Controls review
    • Design Issues / Changes
      • Solar panels connect to the 1" in ground pex (winter / summer)