HVAC 2.0 To Do List
From Green Garage Detroit
Contents
To Do's
Tom Brennan
- Obtain spec for the drainback system (02/01)
- Schedule phone conversation with Alan
- Select weather station and email to Dave for review (02/01)
- Schedule meeting for the ventilation controls (02/01)
- **done** Obtain current status of controls on ERU from Dan B. (02/01)
- email link of As-Built to Dave
- Update sequence of operations (02/01)
Rob Kelly
- Order heat exchanger (02/01)
- Size valves and email to group (02/01)
- Schedule P&F to inspect tanks (02/01)
- Design and estimate solar panel to trickle loop connection (02/01)
- Schedule kickoff meeting (02/01)
- Schedule Jeff introduction visit (02/01)
- Provide final agreement to Green Garage (02/01)
- Develop shared schedule with Green Garage (02/01)
- Need meeting on Thursday at Expert to determine staffing and schedule
Dave Ladwig
- Complete estimate for the controls of the hydronic system (02/01)
- Review the weather station selection for connectivity requirements (02/01)
Joe Gallagher
- Develop shared schedule with Expert Mechanical (02/01)
Closed To-Do's
Meetings
Feb 1
- Attendees: Rob, Dave, Tom, Joe and Tom
- Agenda
- Tanks
- Schedule
- Sign Agreements
- Setup Kick-off meeting
- Controls review
- Design Issues / Changes
- Solar panels connect to the 1" in ground pex (winter / summer)