Difference between revisions of "HVAC 2.0 To Do List"
From Green Garage Detroit
Tom Brennan (Talk | contribs) (New page: === 02/01 === * Tanks * Schedule * Sign Agreements * Setup Kick-off meeting * Controls review * Design Issues / Changes ** Solar panels connect to the 1" in ground pex (winter / summer)) |
Tom Brennan (Talk | contribs) (→02/01) |
||
Line 1: | Line 1: | ||
− | === | + | === To Do's === |
− | * Tanks | + | |
− | * Schedule | + | |
− | * Sign Agreements | + | === Meetings === |
− | * Setup Kick-off meeting | + | ==== Feb 1 ==== |
− | * Controls review | + | * Attendees: Rob, Dave, Tom, Joe and Tom |
− | * Design Issues / Changes | + | * Agenda |
− | ** Solar panels connect to the 1" in ground pex (winter / summer) | + | ** Tanks |
+ | ** Schedule | ||
+ | ** Sign Agreements | ||
+ | ** Setup Kick-off meeting | ||
+ | ** Controls review | ||
+ | ** Design Issues / Changes | ||
+ | *** Solar panels connect to the 1" in ground pex (winter / summer) |
Revision as of 12:15, 2 February 2011
To Do's
Meetings
Feb 1
- Attendees: Rob, Dave, Tom, Joe and Tom
- Agenda
- Tanks
- Schedule
- Sign Agreements
- Setup Kick-off meeting
- Controls review
- Design Issues / Changes
- Solar panels connect to the 1" in ground pex (winter / summer)