(New page: === 02/01 === * Tanks * Schedule * Sign Agreements * Setup Kick-off meeting * Controls review * Design Issues / Changes ** Solar panels connect to the 1" in ground pex (winter / summer))
 
(02/01)
Line 1: Line 1:
=== 02/01 ===
+
=== To Do's ===
* Tanks
+
 
* Schedule
+
 
* Sign Agreements
+
=== Meetings ===
* Setup Kick-off meeting
+
==== Feb 1 ====
* Controls review
+
* Attendees: Rob, Dave, Tom, Joe and Tom
* Design Issues / Changes
+
* Agenda
** Solar panels connect to the 1" in ground pex (winter / summer)
+
** Tanks
 +
** Schedule
 +
** Sign Agreements
 +
** Setup Kick-off meeting
 +
** Controls review
 +
** Design Issues / Changes
 +
*** Solar panels connect to the 1" in ground pex (winter / summer)

Revision as of 12:15, 2 February 2011

To Do's

Meetings

Feb 1

  • Attendees: Rob, Dave, Tom, Joe and Tom
  • Agenda
    • Tanks
    • Schedule
    • Sign Agreements
    • Setup Kick-off meeting
    • Controls review
    • Design Issues / Changes
      • Solar panels connect to the 1" in ground pex (winter / summer)