* Obtain spec for the drainback system (02/01) | * Obtain spec for the drainback system (02/01) | ||
+ | ** Schedule phone conversation with Alan | ||
* Select weather station and email to Dave for review (02/01) | * Select weather station and email to Dave for review (02/01) | ||
* Schedule meeting for the ventilation controls (02/01) | * Schedule meeting for the ventilation controls (02/01) | ||
− | ** Obtain current status of controls on ERU from Dan B. (02/01) | + | ** '''**done** ''' Obtain current status of controls on ERU from Dan B. (02/01) |
− | ** email link of As-Built to Dave | + | ** '''**done** ''' email link of As-Built to Dave |
* Update sequence of operations (02/01) | * Update sequence of operations (02/01) | ||
− | + | ||
==== Rob Kelly ==== | ==== Rob Kelly ==== | ||
+ | * Order heat exchanger (02/01) | ||
* Size valves and email to group (02/01) | * Size valves and email to group (02/01) | ||
* Schedule P&F to inspect tanks (02/01) | * Schedule P&F to inspect tanks (02/01) | ||
Line 15: | Line 17: | ||
* Schedule kickoff meeting (02/01) | * Schedule kickoff meeting (02/01) | ||
* Schedule Jeff introduction visit (02/01) | * Schedule Jeff introduction visit (02/01) | ||
− | * Provide | + | * Provide final agreement to Green Garage (02/01) |
− | + | * Develop shared schedule with Green Garage (02/01) | |
+ | ** Need meeting on Thursday at Expert to determine staffing and schedule | ||
+ | |||
==== Dave Ladwig ==== | ==== Dave Ladwig ==== | ||
* Complete estimate for the controls of the hydronic system (02/01) | * Complete estimate for the controls of the hydronic system (02/01) | ||
* Review the weather station selection for connectivity requirements (02/01) | * Review the weather station selection for connectivity requirements (02/01) | ||
+ | |||
+ | ==== Joe Gallagher ==== | ||
+ | * Develop shared schedule with Expert Mechanical (02/01) | ||
+ | |||
---- | ---- | ||
=== Closed To-Do's === | === Closed To-Do's === | ||
+ | |||
---- | ---- | ||
=== Meetings === | === Meetings === | ||
+ | |||
==== Feb 1 ==== | ==== Feb 1 ==== | ||
* Attendees: Rob, Dave, Tom, Joe and Tom | * Attendees: Rob, Dave, Tom, Joe and Tom |
Latest revision as of 14:44, 4 February 2011
Contents
To Do's
Tom Brennan
- Obtain spec for the drainback system (02/01)
- Schedule phone conversation with Alan
- Select weather station and email to Dave for review (02/01)
- Schedule meeting for the ventilation controls (02/01)
- **done** Obtain current status of controls on ERU from Dan B. (02/01)
- **done** email link of As-Built to Dave
- Update sequence of operations (02/01)
Rob Kelly
- Order heat exchanger (02/01)
- Size valves and email to group (02/01)
- Schedule P&F to inspect tanks (02/01)
- Design and estimate solar panel to trickle loop connection (02/01)
- Schedule kickoff meeting (02/01)
- Schedule Jeff introduction visit (02/01)
- Provide final agreement to Green Garage (02/01)
- Develop shared schedule with Green Garage (02/01)
- Need meeting on Thursday at Expert to determine staffing and schedule
Dave Ladwig
- Complete estimate for the controls of the hydronic system (02/01)
- Review the weather station selection for connectivity requirements (02/01)
Joe Gallagher
- Develop shared schedule with Expert Mechanical (02/01)
Closed To-Do's
Meetings
Feb 1
- Attendees: Rob, Dave, Tom, Joe and Tom
- Agenda
- Tanks
- Schedule
- Sign Agreements
- Setup Kick-off meeting
- Controls review
- Design Issues / Changes
- Solar panels connect to the 1" in ground pex (winter / summer)