==== Tom Brennan ====
 
==== Tom Brennan ====
 
* Obtain spec for the drainback system (02/01)
 
* Obtain spec for the drainback system (02/01)
 +
** Schedule phone conversation with Alan
 
* Select weather station and email to Dave for review (02/01)
 
* Select weather station and email to Dave for review (02/01)
 
* Schedule meeting for the ventilation controls (02/01)
 
* Schedule meeting for the ventilation controls (02/01)
** Obtain current status of controls on ERU from Dan B. (02/01)
+
** '''**done** ''' Obtain current status of controls on ERU from Dan B. (02/01)
** email link of As-Built to Dave   
+
** '''**done** ''' email link of As-Built to Dave   
 
* Update sequence of operations (02/01)
 
* Update sequence of operations (02/01)
+
 
 
==== Rob Kelly ====
 
==== Rob Kelly ====
 +
* Order heat exchanger (02/01)
 
* Size valves and email to group (02/01)
 
* Size valves and email to group (02/01)
 
* Schedule P&F to inspect tanks (02/01)
 
* Schedule P&F to inspect tanks (02/01)
Line 15: Line 17:
 
* Schedule kickoff meeting (02/01)
 
* Schedule kickoff meeting (02/01)
 
* Schedule Jeff introduction visit (02/01)
 
* Schedule Jeff introduction visit (02/01)
* Provide updated estimate
+
* Provide final agreement to Green Garage (02/01)
+
* Develop shared schedule with Green Garage (02/01)
 +
** Need meeting on Thursday at Expert to determine staffing and schedule
 +
 
 
==== Dave Ladwig ====
 
==== Dave Ladwig ====
 
* Complete estimate for the controls of the hydronic system (02/01)
 
* Complete estimate for the controls of the hydronic system (02/01)
 
* Review the weather station selection for connectivity requirements (02/01)
 
* Review the weather station selection for connectivity requirements (02/01)
 +
 +
==== Joe Gallagher ====
 +
* Develop shared schedule with Expert Mechanical (02/01)
 +
 
----
 
----
  
 
=== Closed To-Do's ===
 
=== Closed To-Do's ===
 +
 
----
 
----
  
 
=== Meetings ===
 
=== Meetings ===
 +
 
==== Feb 1 ====
 
==== Feb 1 ====
 
* Attendees: Rob, Dave, Tom, Joe and Tom
 
* Attendees: Rob, Dave, Tom, Joe and Tom

Latest revision as of 14:44, 4 February 2011

To Do's

Tom Brennan

  • Obtain spec for the drainback system (02/01)
    • Schedule phone conversation with Alan
  • Select weather station and email to Dave for review (02/01)
  • Schedule meeting for the ventilation controls (02/01)
    • **done** Obtain current status of controls on ERU from Dan B. (02/01)
    • **done** email link of As-Built to Dave
  • Update sequence of operations (02/01)

Rob Kelly

  • Order heat exchanger (02/01)
  • Size valves and email to group (02/01)
  • Schedule P&F to inspect tanks (02/01)
  • Design and estimate solar panel to trickle loop connection (02/01)
  • Schedule kickoff meeting (02/01)
  • Schedule Jeff introduction visit (02/01)
  • Provide final agreement to Green Garage (02/01)
  • Develop shared schedule with Green Garage (02/01)
    • Need meeting on Thursday at Expert to determine staffing and schedule

Dave Ladwig

  • Complete estimate for the controls of the hydronic system (02/01)
  • Review the weather station selection for connectivity requirements (02/01)

Joe Gallagher

  • Develop shared schedule with Expert Mechanical (02/01)

Closed To-Do's


Meetings

Feb 1

  • Attendees: Rob, Dave, Tom, Joe and Tom
  • Agenda
    • Tanks
    • Schedule
    • Sign Agreements
    • Setup Kick-off meeting
    • Controls review
    • Design Issues / Changes
      • Solar panels connect to the 1" in ground pex (winter / summer)