Difference between revisions of "Front Vestibule - Signage"

From Green Garage Detroit
Jump to: navigation, search
(Ceiling)
(Walls)
 
(2 intermediate revisions by the same user not shown)
Line 22: Line 22:
 
**** Wood (reused) window sill
 
**** Wood (reused) window sill
 
**** Wood (reused) 9" base
 
**** Wood (reused) 9" base
**** Drywall (9" to sill)
+
**** Drywall (9" to sill) + paint
 
*** North / South Wall (semi-thermal)
 
*** North / South Wall (semi-thermal)
 
**** Windows and door system
 
**** Windows and door system
 
**** Wood (reused) window sill
 
**** Wood (reused) window sill
 
**** Wood (reused) 9" base
 
**** Wood (reused) 9" base
**** Drywall (9" to sill)
+
**** Drywall (9" to sill) + paint
 
*** East Wall (semi-thermal)
 
*** East Wall (semi-thermal)
 
**** Windows system
 
**** Windows system
 
**** Wood (reused) window sill
 
**** Wood (reused) window sill
 
**** Wood (reused) 9" base  
 
**** Wood (reused) 9" base  
**** Drywall (9" to sill)
+
**** Drywall (9" to sill) + paint
 
**** Reused wood for signage wall <issue with sun fading>
 
**** Reused wood for signage wall <issue with sun fading>
 
*** Signage East Wall
 
*** Signage East Wall
Line 73: Line 73:
 
=== Doors / Windows ===
 
=== Doors / Windows ===
 
* Requirements
 
* Requirements
** control access to office area
+
** thermal
 +
** safety - tempered glass
 
* Design / Selection  
 
* Design / Selection  
 
** Doors  
 
** Doors  
*** artist do a gate / used iron gate? / Bob D's door cut down
+
*** Custom from Anvil
 +
**** 2-1/4" thick
 +
**** cork centers
 +
**** reused (if possible) wood
 
** Windows
 
** Windows
*** none planned
+
*** West / North / South - Kelly Windows
**** do we need a window to see 3 season room activity
+
*** East side - historic arch (with venting)
 
* Rationale
 
* Rationale
** driven heavily by access control
+
** thermal
 +
** historic
 +
** safety
  
== Appointments / Furniture ==
 
=== Sitting Area ===
 
* '''Requirements'''
 
** Seating for 4+
 
** feel welcome
 
** begin to understand the Green Garage
 
* '''Design / Selection'''
 
** Ideas:
 
** Design
 
*** Seating
 
**** Chairs - used
 
**** Window sill built-in bench
 
*** Welcome table
 
**** circular
 
**** base used bricks (from front windows) and small wood slat sides
 
**** planter in center (plants)
 
**** top (donut) used wood
 
*** Welcome Desk
 
**** curved
 
**** base used bricks (from front windows) and small wood slat sides
 
**** top ?
 
* '''Rationale'''
 
** Sanitary
 
** minimize water
 
  
=== Signage (east wall) ===
 
* '''Requirements'''
 
** hang 30 coats
 
** shelving
 
** durability
 
** reuse
 
* '''Design / Selection'''
 
** Ideas
 
** Design
 
*** Reuse pipe for coat rack
 
*** shelving from reused wood
 
* '''Rationale'''
 
** reuse / easy to use
 
** helps to deliver our message
 
  
 
== Electrical ==
 
== Electrical ==

Latest revision as of 13:26, 9 April 2010

return to Sustainable Detail Design Center

Reference

Envelope

Walls

  • Requirements
    • 4 walls
    • 1 exterior...thermal
    • 3 semi-thermal
    • reuse
    • durability (sun + traffic)
    • first experience / impression
  • Design / Selection
    • Ideas
      • reuse
    • Design
      • West Wall (thermal)
        • Windows and door system
        • Wood (reused) window sill
        • Wood (reused) 9" base
        • Drywall (9" to sill) + paint
      • North / South Wall (semi-thermal)
        • Windows and door system
        • Wood (reused) window sill
        • Wood (reused) 9" base
        • Drywall (9" to sill) + paint
      • East Wall (semi-thermal)
        • Windows system
        • Wood (reused) window sill
        • Wood (reused) 9" base
        • Drywall (9" to sill) + paint
        • Reused wood for signage wall <issue with sun fading>
      • Signage East Wall
        • Green Garage Logo + Name
        • List of businesses (needs to be changeable)
  • Rationale
    • maximize
      • reuse
      • durability / flexibility

Floors

  • Requirements
    • durability for high traffic
  • Design Selection
    • Use historic brick pavers (hocking)
    • radiant under the floor
  • Rationale
    • reuse
    • durability
    • ability to heat via radiant flooring

Ceiling

  • Requirements
    • 1 hour fire rating
    • thermal rating of > 60R
    • durability
    • sound deadening
    • fit above the top of window arch
  • Ideas
    • none
  • Design
    • Arched reused decking + sealed
    • drywall ceiling system above it
  • Rationale
    • fire rating
    • thermal
    • durability
    • historic / reuse look

Doors / Windows

  • Requirements
    • thermal
    • safety - tempered glass
  • Design / Selection
    • Doors
      • Custom from Anvil
        • 2-1/4" thick
        • cork centers
        • reused (if possible) wood
    • Windows
      • West / North / South - Kelly Windows
      • East side - historic arch (with venting)
  • Rationale
    • thermal
    • historic
    • safety


Electrical

Lighting

  • Requirements
    • code: 10fc
    • minimize energy
    • durability / life of bulb (low usage)
    • adequate light
  • Design / Selection
    • Controls
      • switches (dimmers)
      • photocell
    • Design (more research required)
      • See lighting plan E-2 above
      • LED light on signage wall
      • use historic fixture with cfl bulbs (warning: bad performance upside down)
  • Rationale
    • energy efficiency
    • reuse

Outlets

  • Requirements
    • 1 outlet
  • Design / Selection
    • 1 outlets on east wall
  • Rationale
    • maintenance