Front Entrance Awning
From Green Garage Detroit
return to Sustainable Detail Design Center
Reference
- A-1 Floor Plan
- A-2 Building Elevations
- See Woody's sketch of front elevation
Design
- Requirements
- Cover the front entrance area
- Provide shade and stop rain from coming through
- provide drainage (avoid ice)
- meet historic requirements
- meet structural requirements
- Design / Selection
- Ideas
- Reuse: any metal
- Design
- Size:
- Length: 12' - 4" = center of column to center of column + 8" (4" on either side)
- Width out from building: 4' - 6"
- Material
- 8" C channel --- legs pointing out
- reuse pipe horizontal members -or- 4" C channels
- Painted same color as windows - greenblack
- 1/2" plywood roof inset on angle edging
- Duro-last top
- ceiling wood decking
- 1" steel rods / anchors...painted greenblack
- Drainage
- drain to the south
- use a Japanese rain chain (billie will make?)
- Size:
- Ideas
- Rationale
- maximize
- functionality
- reuse
- durability
- maximize