Difference between revisions of "EnviroSolids Building"
From Green Garage Detroit
Tom Brennan (Talk | contribs) (→Building Recommendations (Burt)) |
Tom Brennan (Talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | === Energy | + | === "As Is" Building - Discovering What Is === |
− | + | "All great work begins with observing and becoming more deeply aware of the current reality." | |
+ | ==== Energy Usage ==== | ||
+ | * Utilities | ||
+ | ** Electrical | ||
+ | *** Number of Meters = | ||
+ | *** Electric Bills for 3 years (provide in hard copy) | ||
+ | ** Gas | ||
+ | *** Number of Meters = | ||
+ | *** Gas Bills for 3 years (provide in hard copy) | ||
+ | ==== Building Usage ==== | ||
+ | * Thermostat Settings | ||
+ | ** Heat = | ||
+ | ** Cooling = | ||
+ | * Typical number of people in the building | ||
+ | ** Last 3 years | ||
+ | ==== HVAC Equipment ==== | ||
+ | * Heating | ||
+ | ** Number of Furnaces | ||
+ | *** for each Type / Energy Input (e.g. gas) / Size / Make / Model / Year | ||
+ | *** Photo of equipment and id plate | ||
+ | ** Number of AC Units | ||
+ | *** for each Type / Size / Make / Model / Year | ||
+ | *** Photo of equipment and id plate | ||
+ | ==== Duct System ==== | ||
+ | * Current Duct System | ||
+ | ** Supplies and Returns on a floor plan | ||
+ | ==== Building Envelope ==== | ||
+ | * Need blower door test (write Ken Byczynski @ Kenco <kencoenergy@core.com>) | ||
+ | * Get quote | ||
+ | * Also ask for his thermal inspection of current building | ||
+ | ==== Comfort ==== | ||
+ | * On the floor plan indicte where the building is hot in the summer and cold in the winter. | ||
+ | * Identify any drafts | ||
+ | ==== Energy Modeling Input Data Requirements ==== | ||
[http://www.greengaragedetroit.com/index.php?title=Energy_modeling_checklist Energy Modeling Checklist] | [http://www.greengaragedetroit.com/index.php?title=Energy_modeling_checklist Energy Modeling Checklist] | ||
− | |||
− | |||
=== Building Recommendations (Burt) === | === Building Recommendations (Burt) === |
Latest revision as of 11:40, 29 May 2012
Contents
"As Is" Building - Discovering What Is
"All great work begins with observing and becoming more deeply aware of the current reality."
Energy Usage
- Utilities
- Electrical
- Number of Meters =
- Electric Bills for 3 years (provide in hard copy)
- Gas
- Number of Meters =
- Gas Bills for 3 years (provide in hard copy)
- Electrical
Building Usage
- Thermostat Settings
- Heat =
- Cooling =
- Typical number of people in the building
- Last 3 years
HVAC Equipment
- Heating
- Number of Furnaces
- for each Type / Energy Input (e.g. gas) / Size / Make / Model / Year
- Photo of equipment and id plate
- Number of AC Units
- for each Type / Size / Make / Model / Year
- Photo of equipment and id plate
- Number of Furnaces
Duct System
- Current Duct System
- Supplies and Returns on a floor plan
Building Envelope
- Need blower door test (write Ken Byczynski @ Kenco <kencoenergy@core.com>)
- Get quote
- Also ask for his thermal inspection of current building
Comfort
- On the floor plan indicte where the building is hot in the summer and cold in the winter.
- Identify any drafts
Energy Modeling Input Data Requirements
Building Recommendations (Burt)
- Computer Model
- Entire building
- Allows you to evaluate any change / idea
- Basis on all incentive programs
- Walls
- WUFI (catches vapor/condensation build up)
- Entire building
- Strategy
- Passive
- reduce your demand...then meet the low demand
- Work with the natural system
- Prioritize...heat, cooling, lighting, hot water = 90% of energy
- Insulate the envelope ... Building Science - Perfect Wall
- Roof = 60R
- Floor = 25R
- Walls = 30R
- Eliminate Thermal Bridges (focus on walls)
- All connect points
- Walls-to-Roof
- Walls-to-Floor
- Walls-to-walls
- Window and door framing
- Wall framing
- All connect points
- Air Infiltration (focus on walls, windows and doors)
- < 1 Air Exchange per hour
- ALL building seams
- Windows and Doors seals and framing
- Walls-to-Roof
- Walls-to-Floor
- Windows and Doors seals and framing
- Windows
- Window-to-wall ratio not > 27%
- SHGC = .3 or below
- Windows U = .27 or below
- Eliminate Doorwalls
- Insulate the envelope ... Building Science - Perfect Wall
- Passive
- HVAC Recommendations
- Size to the actual loads ... use modeling
- Most HVAC equipment is at least 50% oversized
- Materials
- spray foam for all cracks
- cfl bulbs inside and induction outside
- aircrete for walls
- mix insulation
- cellulose to absorb humidity
- Incentives
- IRS = Efficient Buildings
- DTE Yes
- Smart Buildings - DEGC