Difference between revisions of "Electrical 2.0 Design Center"

From Green Garage Detroit
Jump to: navigation, search
(Electrical Plans)
Line 17: Line 17:
 
* '''Lighting'''  
 
* '''Lighting'''  
 
** Overview
 
** Overview
 +
  
 
<br style="clear:both;"/>
 
<br style="clear:both;"/>
Line 24: Line 25:
 
   
 
   
 
** Requirements
 
** Requirements
 +
 +
** Design Open Points
 +
* Actual mechanical equipment locations
 +
* Final kitchen area design
 +
** Cabinet and appliance needs and locations
 +
** Receptacle locations
 +
** Lighting design
 +
* Do we want covers on the floor receptacles, and if so, what color/material?
  
 
=== Electrical Plans===
 
=== Electrical Plans===
Line 35: Line 44:
  
 
=== Electrical Shop Drawings===
 
=== Electrical Shop Drawings===
 +
 +
<br style="clear:both;"/>
 +
[[Image:DTE_diagram.jpg|thumb|left|500px|DTE panel to service connection diagram]]
 +
<br style="clear:both;"/>
  
  
 
=== Equipment Information ===
 
=== Equipment Information ===
 +
* All black devices with stainless steel plates
  
  
 
=== Project Management ===
 
=== Project Management ===
 +
* Green Garage responsibilities
 +
** Furnish all light fixtures, exit signs, and emergency lighting fixtures
 +
 +
* Electrical Contractor responsibilities
 +
** Install all light fixtures, exit signs, and emergency lighting fixtures
 +
** Rewire/refurbish historic/recycled light fixtures
 +
  
  

Revision as of 21:15, 3 February 2011

Electrical Requirements

  • Executive Summary
    • Meet the lighting needs primarily through daylight
    • Supplement the daylighting with low-energy artificial lighting
    • We should always ask ourselves "Would anyone else do this if they saw what we did and its cost?". If not, then we need to be seeking a better sustainable value.
  • Technical Summary

Controls Requirements

  • Executive Summary
    • Want a platform that can be user controlled and evolved.
    • Promotes learning and continuous improvement
    • Use earth's natural energy first...then lowest carbon/cost energy next
    • We do not want everything automated. We don't know the building well enough yet. Let us manually control until we develop patterns of operation. Then put them into the controls logic.

Electrical 2.0 Conceptual Requirements

  • Lighting
    • Overview



    • Requirements
  • Power
    • Overview
    • Requirements
    • Design Open Points
  • Actual mechanical equipment locations
  • Final kitchen area design
    • Cabinet and appliance needs and locations
    • Receptacle locations
    • Lighting design
  • Do we want covers on the floor receptacles, and if so, what color/material?

Electrical Plans

Electrical Shop Drawings


DTE panel to service connection diagram



Equipment Information

  • All black devices with stainless steel plates


Project Management

  • Green Garage responsibilities
    • Furnish all light fixtures, exit signs, and emergency lighting fixtures
  • Electrical Contractor responsibilities
    • Install all light fixtures, exit signs, and emergency lighting fixtures
    • Rewire/refurbish historic/recycled light fixtures


Photo Gallery

  • Gallery template from HVAC 2.0 Center