Difference between revisions of "Building Materials Reuse - On Site"
From Green Garage Detroit
(→Strategy and Conceptual Design) |
(→Strategy and Conceptual Design) |
||
(52 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
− | <small>return to [[ | + | <small>return to [[Sustainable Materials Management]]</small> |
=== What is It? === | === What is It? === | ||
Line 19: | Line 19: | ||
*Reuse of any material on site is preferred unless found to be unsafe. | *Reuse of any material on site is preferred unless found to be unsafe. | ||
− | === Green Garage | + | === Green Garage Use of On Site Materials === |
---- | ---- | ||
+ | |||
===== Sustainability Goals ===== | ===== Sustainability Goals ===== | ||
*Reuse 90% of all non-toxic materials on site. | *Reuse 90% of all non-toxic materials on site. | ||
*Recycle 90% of remaining 10% of materials not used on site. | *Recycle 90% of remaining 10% of materials not used on site. | ||
+ | *<1% of materials to enter waste stream. | ||
===== Strategy and Conceptual Design ===== | ===== Strategy and Conceptual Design ===== | ||
{| border="1" cellpadding="5" cellspacing="0" | {| border="1" cellpadding="5" cellspacing="0" | ||
− | ! Material || Original Use || width="150px"|Image || Amount || Reuse || Recycle || Waste | + | ! Material || Original Use || width="150px"|Image || Amount || Reuse || Recycle || Projected Waste |
|- | |- | ||
− | |Wood | + | |[http://en.wikipedia.org/wiki/Lumber Wood] |
*2"x8" | *2"x8" | ||
*2"x4" | *2"x4" | ||
Line 53: | Line 55: | ||
|<1% | |<1% | ||
|- | |- | ||
− | |Gypsum Wall Board | + | |[http://en.wikipedia.org/wiki/Drywall Gypsum Wall Board] |
| | | | ||
*Ceiling throughout warehouse area | *Ceiling throughout warehouse area | ||
Line 64: | Line 66: | ||
*Use of gypsum as material for stucco/plaster | *Use of gypsum as material for stucco/plaster | ||
*Soil (broken) | *Soil (broken) | ||
− | |Grind up and return for remanufacture as drywall | + | | |
− | [http://www.gypsumrecycling.us/ gypsumrecycling.us] | + | *Grind up and return for remanufacture as drywall |
+ | *[http://www.gypsumrecycling.us/ gypsumrecycling.us] | ||
|0% | |0% | ||
|- | |- | ||
− | | | + | |[http://en.wikipedia.org/wiki/Particle_board Particle Board] |
| | | | ||
*Sporadic Wall Covering | *Sporadic Wall Covering | ||
Line 88: | Line 91: | ||
*Glass panel office walls, currently concealed with existing office walls | *Glass panel office walls, currently concealed with existing office walls | ||
|[[Image:glass.jpg|150px]] | |[[Image:glass.jpg|150px]] | ||
− | | | + | |412sq ft |
| | | | ||
*Relocate historic windows within building | *Relocate historic windows within building | ||
*Reuse pane glass for transom windows | *Reuse pane glass for transom windows | ||
*Provide glass for artist etching and painting | *Provide glass for artist etching and painting | ||
− | |Grind up for remanufacture | + | | |
+ | *Grind up for remanufacture | ||
|0% | |0% | ||
|- | |- | ||
Line 104: | Line 108: | ||
|[[Image:block.jpg|150px]] | |[[Image:block.jpg|150px]] | ||
− | | | + | |TBD |
| | | | ||
*Relocate/reuse historic brick | *Relocate/reuse historic brick | ||
Line 113: | Line 117: | ||
| | | | ||
*[http://carlos.engi.cf.ac.uk/db/conmas%20index/richard%20worka.htm Masonry Recycling] | *[http://carlos.engi.cf.ac.uk/db/conmas%20index/richard%20worka.htm Masonry Recycling] | ||
− | | | + | |0% |
|- | |- | ||
− | |Concrete | + | |[http://en.wikipedia.org/wiki/Concrete Concrete] |
| | | | ||
*Additional sidewalk added between city walk and building | *Additional sidewalk added between city walk and building | ||
|[[Image:concrete.jpg|150px]] | |[[Image:concrete.jpg|150px]] | ||
− | | | + | |TBD |
| | | | ||
*Garden retaining walls | *Garden retaining walls | ||
*Steps | *Steps | ||
*Fill for truck ramp | *Fill for truck ramp | ||
− | + | *[http://www.sustainablesites.org/cases/show.php?id=17 Local Example] | |
− | | | + | | |
+ | *0% | ||
+ | *[http://www.concretenetwork.com/concrete/demolition/recycling_concrete.htm Recycling Concrete] | ||
+ | |0% | ||
|- | |- | ||
|Pipe | |Pipe | ||
Line 131: | Line 138: | ||
*Various diameter pipes used for original steam(radiator) heating system | *Various diameter pipes used for original steam(radiator) heating system | ||
|[[Image:pipe.jpg|150px]] | |[[Image:pipe.jpg|150px]] | ||
− | | | + | |TBD |
| | | | ||
*Furniture | *Furniture | ||
Line 138: | Line 145: | ||
*Water catch system | *Water catch system | ||
*Aesthetically | *Aesthetically | ||
− | | | + | |[http://www.detroitscrapmetal.com/ Detroit Scrap Metal] |
− | | | + | |0% |
|- | |- | ||
− | |Cellulose | + | |[http://en.wikipedia.org/wiki/Cellulose_insulation Cellulose] |
| | | | ||
*Blown in cellulose located in ceiling throughout building | *Blown in cellulose located in ceiling throughout building | ||
|[[Image:cellulose.jpg|150px]] | |[[Image:cellulose.jpg|150px]] | ||
− | | | + | |TBD |
| | | | ||
*Relocated Insulation | *Relocated Insulation | ||
− | | | + | | |
− | | | + | *Compost |
+ | *Mulch | ||
+ | |0% | ||
|- | |- | ||
|Electrical Fixtures | |Electrical Fixtures | ||
Line 155: | Line 164: | ||
*Flourescent fixtures located in warehouse and office areas | *Flourescent fixtures located in warehouse and office areas | ||
|[[Image:electrical.jpg|150px]] | |[[Image:electrical.jpg|150px]] | ||
− | | | + | |74 |
| | | | ||
*Relocated | *Relocated | ||
− | | | + | |0% |
− | | | + | |0% |
|- | |- | ||
|Fiberglass Insulation | |Fiberglass Insulation | ||
Line 166: | Line 175: | ||
*Installed under loft area at rear of warehouse | *Installed under loft area at rear of warehouse | ||
|[[Image:fiberglass.jpg|150px]] | |[[Image:fiberglass.jpg|150px]] | ||
− | | | + | |TBD |
− | |? | + | | |
− | | | + | Ongoing debate: |
− | | | + | *[http://www.lungusa.org/site/pp.asp?c=dvLUK9O0E&b=35439 American Lung Association] |
+ | *[http://www.sustainableenterprises.com/fin/basic.htm Dangers] | ||
+ | |No known methods | ||
+ | |TBD | ||
|- | |- | ||
|Duct Flex/Steel | |Duct Flex/Steel | ||
Line 175: | Line 187: | ||
*Heat supplies for forced air heating system in remodeled offices | *Heat supplies for forced air heating system in remodeled offices | ||
|[[Image:duct.jpg|150px]] | |[[Image:duct.jpg|150px]] | ||
− | | | + | |TBD |
− | | | + | | |
− | | | + | *Clean and reuse in new duct work where codes allow |
− | | | + | *Bathroom ventilation |
+ | *[[Earth Tubes]] manifold | ||
+ | | | ||
+ | *Separate components of flexible duct for recycling | ||
+ | |0% | ||
+ | |- | ||
+ | |Ceiling Tiles | ||
+ | (acoustic fiberglass) | ||
+ | | | ||
+ | *Suspended Ceiling | ||
+ | *Acoustical Buffer | ||
+ | |[[Image:ceiling.jpg|150px]] | ||
+ | |TBD | ||
+ | | | ||
+ | *Encapsulate in interior walls | ||
+ | *Kiosk Pin Board | ||
+ | *Sound insulation | ||
+ | | | ||
+ | *[http://www.armstrong.com/commceilingsna/article45691.html Armstrong Recycling Program] | ||
+ | |0% | ||
|- | |- | ||
|Carpet | |Carpet | ||
Line 184: | Line 215: | ||
*Glue down commercial grade floor covering in offices | *Glue down commercial grade floor covering in offices | ||
|[[Image:carpet.jpg|150px]] | |[[Image:carpet.jpg|150px]] | ||
− | | | + | |TBD |
− | | | + | | |
− | |? | + | *Mitigate damage of temporary truck well fill |
− | + | | | |
+ | *[http://www.go-glr.com/Home.aspx?site=3 Great lakes Recycling] | ||
+ | *[http://www.shawfloors.com/Cms/Home.aspx?DN=304350a3-77f6-4118-96db-775897b579cc§ion=Recycling Shaw Industries Recycling Program] | ||
+ | |100% | ||
|- | |- | ||
|Wiring | |Wiring | ||
Line 193: | Line 227: | ||
*Electrical and low voltage (phone) lines from offices and throughout ceiling | *Electrical and low voltage (phone) lines from offices and throughout ceiling | ||
|[[Image:wire.jpg|150px]] | |[[Image:wire.jpg|150px]] | ||
− | | | + | |TBD |
− | | | + | | |
− | |? | + | *Water Chain |
− | | | + | *Artistic Purposes |
+ | | | ||
+ | *[http://www.detroitscrapmetal.com/ Detroit Scrap Metal] | ||
+ | *[http://www.handhmetals.com/ H and H Metals] | ||
+ | (Need process verification. Do they strip and recycle wire coatings?) | ||
+ | |0% | ||
|} | |} | ||
− | [[Image:gg.jpg|150px]] | + | ==== Development Story ==== |
+ | The [[Sustainable Materials Management - Development Story]] has images that document the Green Garage's processes involving materials. | ||
+ | |||
+ | [[Image:gg.jpg|right|150px]] | ||
=== Resources === | === Resources === | ||
---- | ---- | ||
− | * | + | *[http://www.bmra.org/ Building Material Reuse Association] |
+ | ''Peggy edited this page'' :) | ||
[[Category:site index]] | [[Category:site index]] | ||
[[Category:One Earth Patterns]] | [[Category:One Earth Patterns]] |
Latest revision as of 20:26, 7 November 2012
return to Sustainable Materials Management
Contents
What is It?
- The reuse of building materials on site is a process to extend (potentially indefinitely) the period from cradle-to-grave for existing materials in the renovation of a building. Careful methods of deconstruction and repurposing of materials within the building are included in the process.
- Also known as: Repurposing, New Life Reuse, and in some cases Adaptive Reuse and Up-cycling.
Why is it Important?
- Helps to sustain the environment by avoiding landfills.
- Historically preserves the integrity of the building by use of original materials.
- Reduces embodied energy significantly by using materials that are already manufactured and have no need for transportation.
When to Use It?
- When there are any number of materials available for harvest within the space.
- Reuse of any material on site is preferred unless found to be unsafe.
Green Garage Use of On Site Materials
Sustainability Goals
- Reuse 90% of all non-toxic materials on site.
- Recycle 90% of remaining 10% of materials not used on site.
- <1% of materials to enter waste stream.
Strategy and Conceptual Design
Material | Original Use | Image | Amount | Reuse | Recycle | Projected Waste |
---|---|---|---|---|---|---|
Wood
|
|
|
|
<1% | ||
Gypsum Wall Board |
|
7500sq ft |
|
|
0% | |
Particle Board |
|
232sq ft |
|
0% | 0% | |
Glass |
|
412sq ft |
|
|
0% | |
Brick/Block |
|
TBD |
|
0% | ||
Concrete |
|
TBD |
|
0% | ||
Pipe |
|
TBD |
|
Detroit Scrap Metal | 0% | |
Cellulose |
|
TBD |
|
|
0% | |
Electrical Fixtures |
|
74 |
|
0% | 0% | |
Fiberglass Insulation |
|
TBD |
Ongoing debate: |
No known methods | TBD | |
Duct Flex/Steel |
|
TBD |
|
|
0% | |
Ceiling Tiles
(acoustic fiberglass) |
|
TBD |
|
0% | ||
Carpet |
|
TBD |
|
100% | ||
Wiring |
|
TBD |
|
(Need process verification. Do they strip and recycle wire coatings?) |
0% |
Development Story
The Sustainable Materials Management - Development Story has images that document the Green Garage's processes involving materials.
Resources
Peggy edited this page :)