Difference between revisions of "Building Control System"
From Green Garage Detroit
(→Screen Shot Page) |
(→Screen Shot Page) |
||
Line 22: | Line 22: | ||
Image:2013-03-15_0822_time_clock_is_off.png | Image:2013-03-15_0822_time_clock_is_off.png | ||
Image:2013-03-18_0852_ISSUES.png | Image:2013-03-18_0852_ISSUES.png | ||
+ | Image:2013-03-23 0839 lower panel t startup.png | ||
Image:2013-03-24 0904 panel temp at p9 start.png | Image:2013-03-24 0904 panel temp at p9 start.png | ||
+ | |||
Revision as of 13:43, 25 March 2013
If you're interested in seeing what's happening LIVE with the GG HVAC systems, follow the directions below:
- To login to the Green Garage Controls System Web page:
- Click on 66.103.141.2 . This should bring up login page.
- Enter 'demo' as username, and 'demo' as password. You should get directed to page.
- If you're having trouble accessing this site, try updating the Java on your computer.
Screen Shot Page
- These are 24 hour histories of the solar panel operation, showing the start up of pump 9 when called for by the programming. Any anomalies, (i.e. pump starting at low temperatures), will be noted on the image. Double click the image to view larger.