As Built

From Green Garage Detroit
Revision as of 19:20, 2 November 2011 by Peggy Brennan (Talk | contribs)

Jump to: navigation, search

When we finished construction of the building in October of 2011, we made sure that the work that was done was detailed in the following pages. The following represents the various categories of the "as built" environment of the Green Garage.

heating and cooling system

ventilation system

water

lighting

windows

flooring

passive design

doors

walls and insulation

roof

materials

furniture

gardens

operations

green alley

parking lot

solar thermal panels

earth room

earth tubes

As built kitchen

bathrooms and shower

plumbing

greenhouse