Difference between revisions of "As Built"
From Green Garage Detroit
Line 1: | Line 1: | ||
''When we finished construction of the building in October of 2011, we made sure that the work that was done was detailed in the following pages. The following represents the various categories of the "as built" environment of the Green Garage.'' | ''When we finished construction of the building in October of 2011, we made sure that the work that was done was detailed in the following pages. The following represents the various categories of the "as built" environment of the Green Garage.'' | ||
− | + | heating and cooling system | |
− | + | ventilation system | |
− | + | water | |
− | + | lighting | |
− | + | windows | |
− | + | flooring | |
− | + | passive design | |
− | + | doors | |
− | + | walls and insulation | |
− | + | roof | |
− | + | materials | |
− | + | furniture | |
− | + | gardens | |
− | [[ | + | [[operations]] |
− | + | green alley | |
− | + | parking lot | |
− | + | solar thermal panels | |
− | + | earth room | |
− | + | earth tubes | |
As built kitchen | As built kitchen | ||
− | + | bathrooms and shower | |
− | + | plumbing | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
[[Category:site index]] | [[Category:site index]] | ||
[[Category:as built]] | [[Category:as built]] |
Revision as of 19:20, 2 November 2011
When we finished construction of the building in October of 2011, we made sure that the work that was done was detailed in the following pages. The following represents the various categories of the "as built" environment of the Green Garage.
heating and cooling system
ventilation system
water
lighting
windows
flooring
passive design
doors
walls and insulation
roof
materials
furniture
gardens
green alley
parking lot
solar thermal panels
earth room
earth tubes
As built kitchen
bathrooms and shower
plumbing