Difference between revisions of "As Built"
From Green Garage Detroit
Line 27: | Line 27: | ||
As built gardens | As built gardens | ||
− | As built operations | + | [[As built operations]] |
As built green alley | As built green alley |
Revision as of 01:57, 2 November 2011
When we finished construction of the building in October of 2011, we made sure that the work that was done was detailed in the following pages. The following represents the various categories of the "as built" environment of the Green Garage.
As built heating and cooling system
As built ventilation system
As built water
As built lighting
As built windows
As built flooring
As built passive design
As built doors
As built walls and insulation
As built roof
As built materials
As built furniture
As built gardens
As built green alley
As built parking lot
As built solar thermal panels
As built earth room
As built earth tubes
As built kitchen
As built bathrooms and shower
As built plumbing
As built recycling
As built garbage
As built composting